we provide Certified Cisco 650-059 simulations which are the best for clearing 650-059 test, and to get certified by Cisco LCSARS Cisco Lifecycle Services Advanced Routing and Switching. The 650-059 Questions & Answers covers all the knowledge points of the real 650-059 exam. Crack your Cisco 650-059 Exam with latest dumps, guaranteed!

P.S. Certified 650-059 preparation are available on Google Drive, GET MORE: https://drive.google.com/open?id=1CbCaDPvAh4P5mgC0HND_FgR-qmgTKe2I


New Cisco 650-059 Exam Dumps Collection (Question 1 - Question 10)

Q1. In which component would you identify and solve recurring incidents by analyzing incident trends to identify patterns and systemic conditions?

A. problem management

B. operation assessment

C. system acceptance test

D. operations design

Answer: A


Q2. Review both the business and technical requirements is an activity thet is part of which

service component in the prepare phase?

A. business case development

B. customer edication

C. high level design development

D. account planning

Answer: A


Q3. Which of these best describes the actions you would take during the configuration management service component?

A. check whether changes in the infrastructure have been recorded correctly and monitors the status of the components to help ensure anaccurate picture of the network.

B. monitor, manage, and report on service-level metrics and abnormal eventsor trends that may adversely affect the availability, capacity, performance, or security of the enterprise routing and switching system.

A. C. identify and solve recurring incidents by analyzing incident trends to identify patterns and systemic conditions.

D. standartize methods and procedures for authorizing, documenting, and performing changes to a routing and switching system.

Answer: A


Q4. Which of these best describes the actions you would take during the staging plan development service component within the desin phase?

A. help improve the infrastructure security system of the customer

B. assess the abiliy of he site facilities to accommodate the proposed ifrastructure.

C. help improve the performance and functionality of the infrastructure operations and network management system.

D. develop and execute proof-of-concept tests, validate the infrastructure high-level design, and identify any design anhancements.

E. provide a step-by-step plan detailing the instalation and service-commision reqiurement task to be executed in a controlled implementaion environment that emulates a customer network.

Answer: E


Q5. In which service component would you gather information about the customer`s network architecture and network usage requirements?

A. network readiness assessment

B. operations plan development

C. planning project kickoff

D. operations readiness assessment

Answer: A


Q6. Which activity is a part of the operations assessment service component in the optimize phase?

A. design routing and switching infrastructure

B. confirm project and milestone dates

C. conduct gap analysis

D. execute test cases

Answer: C


Q7. Which of these best describes the actions you would take during the technology strategy development service component?

A. analyze the customer`s business requirements and recommend the appropriate technologies to meet those business requirements.

B. identify the customer`s business requirements for the proposed solution.

C. address the customer`s physical site requirements.

A. D. determine the appropriate end user training needed for the technology solution.

Answer: A


Q8. Which two of these activities are part of the phased implementation service component in the implement phase? (choose two)

A. develop a staff training program plan

B. conduct a kickoff meeting

C. prepare the site for the system implementation

D. install, confgure, integrate and test infrastructure

Answer: C,D


Q9. What is the primary objective of the paln phase?

A. identify the activities for installing and configuring the equipment at the customer site or sites

B. assess the existing environment to determine whether it can support the proposed system

C. gain an understanding of high-level business and technical requirements

D. describe the activities involved in day-to-day support, management, and monitoring of the newly implemented system

Answer: B


Q10. Which service component is part of the implement phase and includes the development of a class schedule. training schedule, communications plan, and course outlines, as well as the monitoring of enrollment?

A. operations setup

B. staff training

A. C. select management tools and products

D. change management

Answer: B


Recommend!! Get the Certified 650-059 dumps in VCE and PDF From Certifytools, Welcome to download: https://www.certifytools.com/650-059-exam.html (New 50 Q&As Version)