Proper study guides for Up to date HP Implementing HPE Composable Infrastructure Solutions certified begins with HP HPE0-S58 preparation products which designed to deliver the Validated HPE0-S58 questions by making you pass the HPE0-S58 test at your first time. Try the free HPE0-S58 demo right now.

Also have HPE0-S58 free dumps questions for you:

NEW QUESTION 1
Refer to the exhibit.
HPE0-S58 dumps exhibit
A Synergy integrator needs to establish the module cluster links between two master modules, as shown. Which ports can the integrator use for the module cluster links?

  • A. 1 and 2
  • B. 3 and 4
  • C. 5 and 6
  • D. 7 and 8

Answer: D

Explanation:
References:
https://support.hpe.com/hpsc/doc/public/display?docId=emr_na-a00017673en_us&docLocale=en_US (15)

NEW QUESTION 2
A customer has forgotten the password for the HPE Composer managing the customer’s HPE Synergy Infrastructure.
Where can the customer reset the password with the assistance of HPE Support?

  • A. FLM Access to Synergy Console
  • B. Virtual Center server
  • C. Front Access Panel to Synergy Console
  • D. Maintenance Console screen

Answer: A

Explanation:
References:
https://support.hpe.com/hpsc/doc/public/display?docId=emr_na-a00028780en_us&docLocale=en_US

NEW QUESTION 3
Which tool should an integrator use to determine the power requirements of an HPE Synergy solution?

  • A. HPE Product Bulletin
  • B. HPE SalesBuilder for Windows
  • C. HPE Synergy Planning Tool
  • D. HPE SPOCK

Answer: C

NEW QUESTION 4
Match each HPE server platform with optimal workload.
HPE0-S58 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
HPE0-S58 dumps exhibit

NEW QUESTION 5
A customer with a 3-frame Synergy composable infrastructure has received a second rack to expand existing composable infrastructure resource pools. The integrator has cabled the management ring as shown.
Which steps should the integrator take to increase availability of this configuration (Choose two.)
HPE0-S58 dumps exhibit

  • A. Move on Composer to Rack 2
  • B. Move both Composers to Rack 2
  • C. Enable multi-rack high availability in HPE OneView
  • D. Move both management uplinks to Rack 2
  • E. Move one management uplink to Rack 2

Answer: BE

NEW QUESTION 6
A customer has a datacenter with 3-frame Master/Satellite Synergy solution. They plan to add two additional frames to the remote datacenter, but they want to have a single management tool.
How should the integrator set up the management of the datacenter?

  • A. Add two frames from the remote datacenter as remote enclosures using existing Composer
  • B. Install one Composer in every frame in both local and remote datacenter
  • C. Deploy one Composer in each site and link them together
  • D. Connect the management links with fibre cables if the distance between datacenters is more than 500m

Answer: A

NEW QUESTION 7
During a first-time installation of HPE Synergy, an external monitor is not available to the integrator. Which approach should the integrator take to perform the first-time setup?

  • A. Download MSTCS, connect the laptop to the front Panel Ethernet port, and open a RDP Session to 192.168.10.1 on port 443.
  • B. Download VNC Viewer, connect the laptop to the front Panel Ethernet port, and open a VNC-connection to 192.168.10.1 on port 5900.
  • C. Download Telnet, connect the laptop to the front Panel Ethernet port, and open a connection to 192.168.10.1 on port 8443.
  • D. Download PuTTY, connect the laptop to the front Panel Ethernet port, and open an SSH connection to 192.168.10.1 on any port (default is 22).

Answer: B

NEW QUESTION 8
Which policy can an integrator apply when creating a datastore using HPE OneView for vCenter Server?

  • A. Data at Rest encryption policy
  • B. Round Robin load balancing policy
  • C. Recovery Manager Central policy
  • D. virtual machine Restart policy

Answer: C

NEW QUESTION 9
A customer tries to revert a data volume located on the HPE 3PAR array to a specific snapshot that was taken using HPE Composer, but the process fails. What must an integrator do to fix this problem?

  • A. Install the snapshot agent on the operating system to enable online snapshot operations
  • B. Select the “Force” checkbox to ignore the warning, and revert to the snapshot because this is a data volume
  • C. Navigate to the SSMC and revert to the snapshot using HPE 3PAR tools
  • D. Disconnect the volume from the server, then revert to the snapshot and reconnect back to the server

Answer: C

NEW QUESTION 10
Which HPE Synergy D3940 storage module configuration is valid?

  • A. a single RAID set to be shared across the SAS fabric to multiple compute nodes as a virtualization host datastore
  • B. maximum of three HPE Synergy D3940 storage modules per frame to be used by any compute module within the management ring
  • C. any number of the drives from storage module to be mapped to any single compute node
  • D. a pair of disks to house Composer backups and Synergy firmware bundles

Answer: A

NEW QUESTION 11
A customer needs to expand a single-frame Synergy solution to two frames.
What should the integrator do to establish a proper management network for the two frames?

  • A. Connect the RJ-45 management ports of the Virtual Connect modules together with redundant CAT6Acables.
  • B. Disconnect the existing management ring, and cable the Frame Link Modules in the first frame to the Frame Link Modules in the added frame.
  • C. Connect the RJ-45 front panel connectors on the two frames together with a single CAT6A cable.
  • D. In the Synergy console, select the Frame Link Modules in the new frame and define the connection between them.

Answer: D

NEW QUESTION 12
An integrator needs to configure a set of networks for Synergy compute nodes to send data to devices outside of a Synergy frame.
How should the integrator complete the task?

  • A. Add the network to an interconnect bay within a Logical Enclosure (LE)
  • B. Add the networks to an uplink set within a Logical Interconnect Group (LIG)
  • C. Add the networks to an Enclosure Group (EG)
  • D. Add the network sets to a Logical Interconnect Group (LIG)

Answer: A

NEW QUESTION 13
An HPE Synergy compute module has a template-based server profile with two identically configured connections, each containing five VLANs.
What is the most efficient method the integrator can use to add a new VLAN to each connection?

  • A. Add the new VLAN to the network set configured in the profile template, and update the server profile from the template
  • B. Add the new VLAN under Edit server profile connections
  • C. Add the new VLAN to the network set configured in the profile template
  • D. Add the new VLAN under Edit server profile connections in the profile template, and update the server profile from the template

Answer: A

NEW QUESTION 14
An integrator is creating a server profile template for a VMware Cluster in a Synergy environment. The network administrator has given the server team two 40Gb uplinks with all 200 VLANs presented.
Click the appropriate network type that the integrator should select.
HPE0-S58 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
HPE0-S58 dumps exhibit

NEW QUESTION 15
Refer to the exhibit.
HPE0-S58 dumps exhibit
A customer has an HPE Synergy 2-frame configuration, as shown. The customer has a new project and needs to increase the number of compute modules.
What is the maximum number of compute nodes that the customer’s fabric could support?

  • A. 24
  • B. 36
  • C. 48
  • D. 60

Answer: D

NEW QUESTION 16
Which storage solution can be used for volume provisioning using HPE Composer?

  • A. MSA 2040
  • B. HPE StoreEasy 1560
  • C. HPE 3PAR StoreServ
  • D. HPE XP7 Storage

Answer: C

Explanation:
References: https://www.karma-group.ru/upload/iblock/30b/hpe_synergy_composer.pdf

NEW QUESTION 17
Which component of the HPE Synergy solution should you use to set the firmware/driver baseline and the installation method for Synergy Compute nodes?

  • A. Composer
  • B. Smart Update
  • C. Image Streamer
  • D. Global Dashboard

Answer: B

Explanation:
References: https://support.hpe.com/hpsc/doc/public/display?docId=c05212310

NEW QUESTION 18
A customer wants to expand their existing cluster using the Grow Cluster functionality from OneView for vCenter Server.
Which OS build plan managed by HPE OneView for vCenter Server can the customer use?

  • A. ICsp-Based Deployment
  • B. iLO Federation-Based Deployment
  • C. Image Streamer-Based Deployment
  • D. PXE-Based Deployment

Answer: A

Explanation:
References:
https://support.hpe.com/hpsc/doc/public/display?docId=emr_na-a00036306en_us&docLocale=en_US

NEW QUESTION 19
A customer is planning to deploy OneView for vCenter Server to improve management procedures for growing virtualization environment. The customer is concerned about resources required by HPE OneView for vCenter Server.
Which statement about deploying HPE OneView for vCenter Server is true?

  • A. It is deployed as an application on the Windows Server machine with at least 48GB of memory.
  • B. It is deployed as a part of the HPE Composer installation.
  • C. It is deployed as a virtual machine on the supported hypervisor.
  • D. It can only be deployed if HPE Global Dashboard is already installed.

Answer: C

NEW QUESTION 20
A customer is planning an HPE Synergy solution with 20 frames and needs to minimize the number of management ports that are required to connect the frames into the existing management network.
Which procedure should the integrator use to address the customer’s concern?

  • A. Connect the RJ-45 front ports of each frame to an external switc
  • B. Then, connect the uplink from the external switch into the customer’s management network.
  • C. Connect FLMs from all frames to two external switches for redundanc
  • D. Then, connect the two uplinks from the two switches into the customer’s management network.
  • E. Connect the RJ-45 front ports of each frame to two external switches for redundanc
  • F. Then, connect the uplink from the two switches into the customer’s management network.
  • G. Connect FLMs from all frames into a management rin
  • H. Then, connect the management ring to the customer’s management network using two uplinks.

Answer: D

NEW QUESTION 21
A customer has the following HPE Synergy solution:
HPE0-S58 dumps exhibit three Synergy frames
HPE0-S58 dumps exhibit two HPE Virtual Connect SE 32Gb Fibre Channel (FC) modules in each time
HPE0-S58 dumps exhibit two HPE Virtual Connect SE 40GB F8 modules
HPE0-S58 dumps exhibit four HPE Synergy 10Gb Interconnect Link Modules
Click the menu option the integrator should use to add more uplinks ports from HPE Virtual Connect SE 32 Gb FC modules to SAN uplink set.
HPE0-S58 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
References: https://h20215.www2.hpe.com/v2/GetPDF.aspx/c04815258.pdf

NEW QUESTION 22
Which operating systems are supported for use with Image Streamer? (Choose two.)

  • A. VMware ESXi 6.7
  • B. CentOS 7.2
  • C. SUSE Linux Enterprise Server 11
  • D. Windows Hyper-V 2021
  • E. Red Hat Enterprise Linux 7.3

Answer: DE

Explanation:
References:
https://support.hpe.com/hpsc/doc/public/display?docId=emr_na-a00061945en_us&docLocale=en_US

NEW QUESTION 23
......

Thanks for reading the newest HPE0-S58 exam dumps! We recommend you to try the PREMIUM Surepassexam HPE0-S58 dumps in VCE and PDF here: https://www.surepassexam.com/HPE0-S58-exam-dumps.html (97 Q&As Dumps)